Ad

Add your comments


This page has been viewed 94 times

LTE: Article caused misunderstanding on progress of 301 study

Maryland Independent,

Discussions with various citizens and officials have brought to my attention that the June 10 article, “State gridlock stalls bypass,” has caused misunderstanding of the progress of the current U.S. 301 Waldorf Area Study.

There are several points which require clarification.


Posted by: Sammy on 07/01/09 at 04:02 PM
    Page 1 of 1 pages
  • 1. · Another EXCELLENT LTE from Mr Wallace.

    This one part really stood out--

    In addition to the foregoing, the photo accompanying the article shows the backup of U.S. 301 southbound left-turning traffic at Mattawoman Beantown Road.

    This junction was approved with a fly-over for left turning traffic, but the fly-over was not constructed at that time. In the current study, one of the alternatives for upgrading U.S. 301 through Waldorf provides that flyover. The bypass alternatives do not.


    How sweet would it be to have had that fly-over constructed rather than leave the job half-done!

    Comment by seahorse  on  07/02/09  at  09:45 PM | [Back to Top] | [Back to Main]
  • Page 1 of 1 pages

YOU MUST BE A REGISTERED MEMBER AND LOGGED-IN TO POST COMMENTS

Smileys

Remember my personal information

Notify me of follow-up comments?

Ad

<< Back to main

Copyright © 2003-2010, Delusional Duck™, All rights reserved. Delusional Duck™ is a Registered Trademark.
Comment Policy | Terms of Use | .(JavaScript must be enabled to view this email address)
Home | Discussion Forums